Price's Development

 Due to construction, there may be an interruption in waste collection. If garbage is not collected on its scheduled pick-up day, it will be collected by the end of the following day.

Project Information

The Town has identified the area known as Price’s Development for wastewater servicing and drainage improvements. Price's Development generally includes Claire Glen, Patricia Drive and Martin Grove in the area of Grey County Road 19, Blue Mountain Road and Scenic Caves Road at the base of Blue Mountain Ski resort in the Town of The Blue Mountains.

Preliminary Engineering has been completed and the Town has awarded a tender for construction to North Rock Ltd. Construction is to begin in May of 2021 and to be completed by October 2021. A Public Information Centre was held on April 21st, 2021 to discuss the project. Property owners in the Price's Development area are asked to provide a Service Lateral Location before construction begins. A list of properties that have provided a location is available online and was most recently updated on June 4th, 2021. The week of May 31st, 2021, Oza Inspections began a pre-construction condition survey of properties in the area to verify existing conditions.

The construction of the sewer extension into Price’s Development is scheduled begin on July 12, 2021. The work will begin at the south limit of Windfall Subdivision behind 182 & 186 Yellow Birch Crescent. Ahead of the sewer installation, trees will be cleared in preparation for the construction, with tree clearing beginning on July 5, 2021. Prior to clearing, trees will be inspected to assure no active nests are present. The trail in the construction area will be closed for approximately three weeks during this time, and the Town apologizes for the inconvenience to impacted residents.

Project Updates

October 19, 2021: The Town is taking the opportunity of this project to implement improvements in the water distribution system on Grey Road 19 east of Patricia Drive. As a result, some water shutdowns will occur over the next two weeks. Written notices will be hand delivered to affected properties.

October 15, 2021: Scenic Caves Road has reopened, and installation of the box culvert on Grey Road 19 is nearing completion. Installation of services on Patricia Drive and Martin Grove may are scheduled to continue though the weekend and to be completed the week of October 18. Work on the main line sewer south of Grey Road 19 will continue next week as well.

October 1, 2021: The contractor is scheduled to begin installation of two new sections of box culvert starting Tuesday, October 5, 2021. Road closures will be found on Grey Road 19 from the Blue Mountain Resort roundabout to Claire Glen Road, and on Scenic Caves Road from the Blue Mountain Resort roundabout to Blue Mountain Road. The installations will be happening consecutively and are expected to be completed within two weeks. Posted detour routes on Blue Mountain Road and Claire Glen Road will ensure access from all directions is maintained for public and emergency vehicles while construction takes place.

September 22, 2021: Environment Canada issued a rainfall warning for the Town of The Blue Mountains. The Town’s contractor has cleared the ditches of obstructions and the existing culverts are open and flowing, but it’s expected that this rainfall will overwhelm the existing drainage system in Price’s Development. Inadequate grading on private property continues to put pressure on the drainage infrastructure in the area. Planned storm diversion work designed to reduce flooding in the area is scheduled to begin in the coming weeks.

September 13th, 2021: The contractor has two crews working right now working on the sanitary sewers and services. The sewer and service installation on Claire Glen is complete. The sewer and services on Patricia Drive and Blue Mountain Road are slated to be finished this week, and then the crews will be transitioning onto Martin Grove. A third crew is scheduled to be on site the week of September 20 to begin working on the storm water diversion.  

August 26th, 2021: Main line work has been completed on Claire Glen and a second crew has begun work to complete servicing on Claire Glen. Main line work is nearing completion on Blue Mountain Road as construction continues on Patricia Drive. After main line work is completed on Patricia Drive, the servicing crew will begin work on servicing. A third crew is set to arrive in early September to begin work on drainage improvements.

August 16th, 2021: Due to construction, there may be a temporary interruption in the collection of waste & recycling. If not collected on the scheduled pick-up day, it will be collected by the end of the following day. 

August 13th, 2021: Construction is wrapping up on Claire Glen and crews will begin work on Blue Mountain Road between Claire Glen and Patricia Drive. There will be temporary access to County Road 19 for cars on Patricia Drive. 

August 6th, 2021: North Rock Construction is continuing work on Claire Glen. 

July 23rd, 2021: Sewer construction will continue on Claire Glen for the week of July 26th. 

July 16th, 2021: Construction is continuing on Claire Glen next week, with tree clearing to continue on Patricia Drive and Martin Grove. 

July 9th, 2021: North Rock Ltd. Construction will be onsite beginning July 12th to start tree clearing and sewer installation.

Study Area & Background Reports 

January 2020

The Town’s Construction Coordinator sent a letter to residents dated January 13, 2020 as a brief update on the project and a request for crucial information regarding servicing of individual lots. The letter to the Resident of Price's Development along with a Notice/ Questionnaire and Owner Requested Service Location Form can be accessed on the sidebar to the right on this page.

August 2018 

The Town's Construction Coordinator presented Staff Report CSPW.18.055 entitled "Follow up to the Public Information Centre for Price's Subdivision" to the Committee of the Whole.

July 2018 

The Town's Construction Coordinator sent a project update letter to residents dated July 24, 2018. If you wish to view the letter, please click here: Price's Subdivision - Project Update - July 2018.

 January 2018

The Town's Construction Coordinator sent a letter to residents dated January 3, 2018, advising them that the preliminary engineering for Price’s Subdivision Wastewater Servicing and Storm Drainage Improvements has been delayed until Spring 2018.  The Town has delayed the final design and construction on the project until 2019 and 2020 respectively pending the completion of the Preliminary Design Report and the direction of Town Council.

If you wish to view this letter, please contact the Operations Department and reference IPW File: I74-0476

February 2017

The Town's Engineering Design Technologist sent a letter to residents dated February 22, 2017, advising that Council has approved the Capital Budget to proceed with the drainage study and preliminary design of the wastewater servicing. The Town has initiated the procurement process to retain a consulting engineering firm to start gathering background information. Residents will be contacted in early summer of 2017 to provide input.

If you wish to view this letter, please contact the Operations Department and reference IPW File: I74-0476

December 2016

Director of Operations Department (formerly IPW) sent a letter to residents dated December 16, 2016 regarding the cost of the project, financing and repayment options. Town Council will consider undertaking the preliminary design phase of the project January, 2017 and residents were advised to provide comments to the Town's Engineering Design Technologist, by January 16, 2017.

If you wish to view this letter, please contact the Operations Department and reference IPW File: I74-0476

Project Status - Construction

Public Meetings & Information Centres 

Price's Development Wastewater Servicing and Stormwater Drainage Improvements Project Preliminary Design Report
(Public Notice can be viewed here)

When: Wednesday, April 21, 2021 at 5:00 pm to 7:00 pm.
Where: Held virtually on Microsoft Teams
(A recording of the meeting can be viewed here)

A copy of the PIC presentation can be found here: Price's Development PIC Presentation - April 21, 2021

Prices Subdivision Wastewater Servicing and Stormwater Drainage Improvements Project  

When:  Saturday, April 7, 2018  at 10:00 a.m. - Noon 
             Presentation at 10:30 a.m. 
             Thursday, April 12, 2018 at 7:00 p.m. - 9:00 p.m.
             Presentation at 7:30 p.m.   

Where:  Town Hall, Council Chambers 

A copy of the PIC Presentation can be found here:  Prices Subdivision PIC Presentation, April 2018

If you require an alternative version of either of the presentations above, please contact the Operations Department. 

Contact Details

For more information please contact: 

Brad Parker, P.Eng.
Project Engineer 
Greenland Consulting Engineers
Phone: 705-444-8805 ext. 301   
Email: bparker@grnland.com 

OR 

Construction Coordinator
Town of Blue Mountains
32 Mill St. Thornbury, ON. N0H 2P0
Phone: 519-599-3131 ext. 275


Contacts

Construction Coordinator
519-599-3131 x275

Documents