Residential Dwelling Permit Guide

Before you apply for a residential dwelling building permit, you must identify how the property will be serviced. There are three options:

  1. A dwelling that is connected to the municipal water and wastewater systems
  2. A dwelling that is connected to the municipal water system, but has a private septic system
  3. A dwelling that is connected to a private water system and septic system

Unique guides for each servicing arrangement are available below. If you are unsure of the services available to your property, please contact build@thebluemountains.ca.

Please Note: All application forms, drawings, and related documents shall be submitted electronically in PDF format to build@thebluemountains.ca or by using our secure ShareFile system. Please refer to our Electronic Document Submission Guide. 

Next Steps

Submit complete application including supporting documentation, electronically to build@thebluemountains.ca. Application is reviewed for completeness and compliance with the Ontario Building Code and Applicable Law. Application review comments are provided during review to identify any outstanding requirements and to summarize permit fees. Permit will be  Incomplete permit applications will delay permit processing time. Construction shall not start until permit has been issued. B307-10/05/2023 issued when review is complete, and all fees are paid. Construction begins and inspections may be scheduled. Building Inspector checks major phases of construction until Completion.