Artisan at Lora Bay (formerly known as Branch Subdivision)

The proposal is for a five (5) lot Plan of Subdivision previously draft approved in 1993. The current request is for a "redline revision" to the draft plan to convert the proposed public road and open space block to a common element condominium block.

The Committee of Adjustment for the Town of The Blue Mountains also recently approved a minor variance application to adjust required front yard and the centreline of road setback for these lots.

More information and documents are available on the Grey County website:

https://www.grey.ca/planning-development/planning-applications

Denise Whaley, Planner 519-599-3131 ext. 262
Key Map
Key Map

Return to Top of Page

Peaks Meadows - Block 46

The proposal is to create 12 lots for single detached houses on what is known as "Block 46" of subdivision Plan 16M-20 (Dorothy Drive).

The applicant applied  to the County of Grey for a Plan of Subdivision of the the lands and to the Town of The Blue Mountains for a Zoning By-law amendment. The zoning amendment seeks to change the permissions from to 65 Townhouses to 12 single detached dwellings.

A Joint Public Meeting  with the County of Grey will be held November 15, 2017 at 5:00 pm. The notice is available by clocking the document link below.

More information on this project is available on the Grey County Planning Applications page, including supporting studies and interactive mapping: https://www.grey.ca/planning-development/planning-applications

Denise Whaley, MSc RPP, Planner 519-599-3131 ext. 262 planningservices@thebluemountains.ca
Key Map
Key Map

Return to Top of Page

2223117 Ontario Inc (Gibraltar Sand and Gravel Extension - formerly known as Conn Pit)

The proposal is to expand the existing Gravel Pit onto the vacant area of the property (east side of property). This proposal requires Council and County approvals, and the applicant has applied for Official Plan and Zoning By-law amendments to seek permission to expand the gravel pit.

If this proposal is approved, the amendments would change the permitted uses on the property to allow gravel extraction.

A public meeting was held  May 16, 2016 at Town Hall. See the Public Notice below.

A decision on this proposal has not yet been made.

Further information and documents are available at the Grey County website:

https://www.grey.ca/planning-development/planning-applications

Denise Whaley 519-599-3131 ext. 262
Key Map
Key Map

Return to Top of Page

Construction Status Report

Bi-Monthly Construction Status Reports sent to Committee and Council to keep everyone apprised of the status of the Towns current Capital Construction Projects.

Mike Campbell, Construction Coordinator 519-599-3131 ext. 275 cc@thebluemountains.ca

Return to Top of Page

Lora Bay Phase 3B Subdivision

The County, in consultation with the Town, received a received a resubmission of a Plan of Subdivision application, known as Lora Bay Phase 3B - File 42T-2015-04.  The Plan of Subdivision proposed to recreate a total of 35 residential uts, consisting of 23 single detached residential lots, 1 multi-residential unit block containing 12 units, and a common elements condominium road block on approximately 3.92 hectares (9.69 acres).

UPDATE NOVEMBER/DECEMBER 2015:

The Plan of Subdivision Recommendation Report went to November 16, 2015 Committee of the Whole of Council Meeting, which was subsequently endorsed by Town Council at the November 30, 2015 Council Meeting.   The Town's recommendations were forwarded to the County of Grey, so that they could review in making a decision on the plan of subdivision.

The appeal period on the decision by County of Grey has lasped, based on Notice of Decision being given December 15, 2015, with a three year lapse date of approval being December 10, 2018.

The Applicant is currently fullfilling draft plan conditions in order to proceed to final approval and registration.

Return to Top of Page

Home Farm Subdivision Proposal

Applications have been submitted for an Official Plan Amendment and a Zoning By-law Amendment for a property known as "Home Farm". The Proposal is for a new residential subdivision consisting of  85 single detached, 60 semi detached and 132 townhouse units, for a total of 277 units. The subject lands includes several parcels on Concession 2, Part of Lot 20, with road access on Grey Road 19. The lands are owned by MacPherson Builders (Blue Mountains) Limited, and one parcel is owned by the Town of The Blue Mountains. A land exchange has been proposed where the developer would give the Town of The Blue Mountains a section of land in exchange for a  municipal parcel and part of a road allowance.

A Public Meeting for this proposal has not yet been scheduled.

A Public Open House was held Nov 21, 2015. See also the notices below.

Denise Whaley 519-599-3131 ext. 262 planningservices@thebluemountains.ca
Key Map
Key Map

Return to Top of Page

Windfall Medium Density Block

Windfall Medium Density Block is a development of lands at the north-west corner of County Roads 19 and 21 for a 242 medium density residential condominium dwelling types.  The agent has provided an Official Plan, Zoning By-law Amendment and Site Plan Applications for this proposal.  The formal pre-consultation process started in September 2013 and is summarized under Tab 2 to our August 2014 Planning Justification Report.  The responses to the pre-consultations are addressed in the Planning Justification Report and supporting technical information.

Shawn Postma 519-599-3131 ext. 248 spostma@thebluemountains.ca

Return to Top of Page

Applevale Properties Limited

A 1.1 hectare parcel of land located at the southwest corner of the Victoria Street/Alfred Street intersection within the former Town of Thornbury.  The owner wishes to develop a residential subdivision comprising of 11 detached dwellings lots and a new municipal road in the form of a cul-de-sac extending from Victoria Street.

Shawn Postma 519-599-3131 ext. 248 spostma@thebluemountains.ca

Return to Top of Page

Sleepy Hollow WEST

Sleepy Hollow West is a proposed 10 lot Plan of Subdivision located near Craigleith Road and Sleepy Hollow Road between Alexandra Way and Innsbruck Lane.  Additional information on this project can be found below.

Shawn Postma 519-599-3131 ext. 248 spostma@thebluemountains.ca

Return to Top of Page

Sleepy Hollow EAST

The purpose of these applications is to consider a development proposal for an eight lot Plan of Subdivision on the subject lands.  Six new residential lots are proposed along a Common Elements Condominium Road extending east from Salzburg Place, one residential lot is proposed off of Sleepy Hollow Road, and one large lot is proposed to be retained for open space and future development purposes.

Shawn Postma 519-599-3131 ext. 248 spostma@thebluemountains.ca
Key Map Location
Key Map Location
Proposed Draft Plan
Proposed Draft Plan

Return to Top of Page

Contacts

Director Planning and Development Services

Director Planning and Development Services
519-599-3131 x246
directorplanningdevelopment@thebluemountains.ca

download the free adobe pdf reader at get.adobe.com/readerdownload the free Adobe pdf reader at get.adobe.com/reader
All documents found on our website can be made available in other accessible formats where practicable and upon request.
printable page